BX series metering boxes are widely used in commercial outlets, villas, and civil places with large power consumption and many power consumption contents that need independent metering at the AC 380V/220V voltage level. it is applicable to 0.38Kv low-voltage lighting users with equipment capacity below 5kW.
serial number |
name |
unit |
data |
1 |
rated(Three phase power supply ) |
V |
380V |
2 |
Frequency |
Hz |
50Hz |
3 |
Degree of protection |
IP |
IP30 |
4 |
User capacity |
kW |
100kW below |
Installation and maintenance |
1.The lower edge of the lighting metering box shall be 1400-1600mm high from the ground.
2.The installation height of the power metering box is determined according to the user's requirements and the actual situation of the installation site
3.The metering tank shall be installed vertically with an inclination of no more than 3 °.
4.After the product arrives at the destination, first check whether the packing is complete. If the product is not installed and sed immediately, place the product in a dry and clean place; During installation, the installation must be carried out according to e dimensions listed in the drawing. For open installation, the installation bolts shall be embedded in advance. Embedded, emont be reserved, and the corresponding pipelines, and the installation bolts and nuts shall be prepared by the user; After installation, the outgoing line can be connected, and the ground wire can be connected to the box for protective grounding.
Golden Triangle Electric Power Technology Co., Ltd, registered on 9th November, 2009 and is located at No. 66, Binhan Nansan Road Road, Yueqing Economic Development Zone,Wenzhou, China. (Main Product: The development, manufacturing and sales of Laminated CRGO distribution transformer, Amorphous Alloy distribution transformer, 3D CRGO distribution transformer, 3D amorphous alloy distribution transformer both for OIL and DRY TYPE (Voltage from 3 to 35kV) , Box-type Substation, Photovoltaic Substation and Wind power substation etc.) Golden Triangle is a national high-tech enterprise, focusing on the research, development and sales of "distribution transformer ". It has acquired such invention patents as "a circular cross section 3D three-phase transformer core (Patent No.: ZL 99114376)" , "molding equipment and technology of standard rectangular amorphous alloy triangular wound core single frame (patent number: 201610115993.6)", "amorphous alloy rectangular solid triangular wound core single frame processing method (Patent No.: 201610107516.5)"etc. with 5 invention patents and more than 50 utility model patents.
Golden Triangle has its main business spread at home and abroad, At home it is qualified supplier for China State Grid, China Southern Power Grid and meanwhile export its products to many countries, such as Peru, Brazil, Ethopia,Egypt, Nigeria,Zimbabwe, Nepal, Sri Lanka , Bangladesh. etc.
Factory display
The picture on the left is the scene of workers working.The workers are deeply engaged in their tasks, demonstrating unwavering dedication and focus. Their hands skillfully manipulate the tools as their eyes closely monitor every detail, ensuring the highest quality of work. Sweat beads on their foreheads, yet they remain undeterred, driven by a strong sense of responsibility and commitment.
Workers are meticulously inspecting the production line. They are equipped with advanced tools and are carefully examining each component to ensure its quality meets the stringent standards. One worker is taking precise measurements while another is recording data on a digital device.
Office display
This is our company's conference room, which is not only spacious but also equipped with state-of-the-art facilities to ensure efficient and productive meetings.
1.Are you manufacturer?
Yes, we are manufacturer. Our factory is in Wenzhou China.
2.Can I get guarantee of products?
Yes, every product is 1 year quality warrantee under customer correct using the products.
3.Do you have any Certificate?
Yes. Each of our unit has CCC, ISO9001 certificate. All the electric parts with CE certificate, If you need any other Certificate, we can help you to get it.
4.How to buy it? What about the delivery?
Please contact me by email or online, let me know your situation, I will give you professional solution. We have shipping agent can choosing the cheapest and fastest delivery. FOB, CIF, C&F or EXW are no problem for us.
5.What's the payment terms?
For small testing orders, we can accept Waster union, T/T and Credit card.
For mass orders, we accept t/t and L/C.
6.What about the production?
Produce time is 4~6weeks.
7.Could you offer some spare parts?
Yes, no problem.
8.What about the maintenance?
All the goods past the test, maintenance is very easy.