The oil-immersed transformer is a new type of high-performance transformer with a more reasonable structure and better performance. It uses oil as the main insulation medium and relies on oil as the cooling medium, such as oil-cooled self-cooling, oil-cooled air-cooling, oil-cooled water-cooling, and forced oil circulation, etc. The main components of the transformer include the iron core, windings, oil tank, oil reservoir, respirator, explosion-proof tube (pressure release valve), heat sink, insulation bushing, tap changer, gas relay, thermometer, and oil purifier, etc.
Due to the long-term immersion of the silicon steel sheets in the transformer, oil can seep into the interlayers, and the transformer oil has elasticity to act as a buffer. Therefore, the oil-immersed transformer has low noise. However, the voltage regulating switch is inside the oil tank. When adjusting the voltage, the contact condition of the switch cannot be seen outside. If the contact is not good, it is equivalent to a break in that circuit. If the contact is poor, when the load is too large, the switch is prone to burn out.
Transformer normal service conditions
1.The height above the sea level is below 1000m;
2.Highest air temperature +40ºC;
3.Highest daily average air temperature+30ºC;
4.Highest annual average air temperature +20ºC;
5.Lowest outdoor air temperature -25ºC.
(defines in detail when transformer in special service conditions )
Type of cooling
(1) Oil-immersed transformers usually adopt three cooling methods: oil-immersed self-cooling, oil-immersed air-cooling, and forced oil circulation.
The oil-immersed self-cooling method relies on the natural convection of oil to dissipate heat.
(2). The oil-immersed air-cooling method is based on the oil-immersed self-cooling method, and additional fans are added to blow air into the oil tank and oil pipes to enhance the heat dissipation effect. Forced oil circulation uses an oil pump to extract the hot oil from the transformer, cool it outside the transformer, and then send it back into the transformer.
Structure Function
In the main substation of the urban rail transit power supply system, the main transformer usually adopts a three-phase oil-immersed transformer. The oil-immersed transformer mainly consists of the core, windings, oil tank, voltage regulating device, radiator, oil reservoir, gas relay, insulation bushing, explosion-proof tube, etc.
1. Core
The core is composed of silicon steel sheets stacked together with good magnetic conductivity. It forms a magnetic flux closed circuit, and the primary and secondary windings of the transformer are wound on the core.
The transformer core is divided into two structures: core type and shell type. Currently, the widely used transformers are of core type. The core of the core type transformer consists of the core column and the yoke. The core of the oil-immersed transformer has oil channels inside for cooling the core, which facilitates the circulation of transformer oil and also enhances the heat dissipation effect of the equipment.
2. Winding
The winding, also known as the coil, is the conductive circuit of the transformer. It is made by winding copper wire or aluminum wire into multiple layers of cylindrical shapes. The primary and secondary windings are concentrically arranged on the core column and are insulated from each other. The low-voltage winding is usually inside and the high-voltage winding is outside. The insulating material is wrapped around the wire to ensure insulation between the wires and between the wires and the ground.
3. Oil Tank
The oil tank is the outer shell of the oil-immersed transformer. Besides holding oil, it is also used to install other components. [2]
4. Voltage Regulator
The voltage regulator is set up to ensure the stability of the secondary voltage of the transformer. When the power supply voltage fluctuates, the voltage regulator is used to adjust the tap switch of the transformer to ensure the stability of the secondary output voltage. The voltage regulator is divided into on-load voltage regulator and off-load voltage regulator.
5. Radiator
The radiator is installed on the oil tank wall. The upper and lower parts are connected to the oil tank through pipes. When there is a temperature difference between the upper and lower oil temperatures of the transformer, the radiator forms oil convection, and the cooled oil flows back to the oil tank to reduce the temperature of the transformer oil. To improve the cooling effect, measures such as self-cooling, forced air cooling, and forced water cooling can be adopted.
6. Oil Sump
The oil sump is also called the oil tank. Transformer oil will undergo thermal expansion and contraction due to temperature changes, and the oil level will rise or fall accordingly. The function of the oil sump is to provide a buffer for the thermal expansion and contraction of the oil, keeping the oil tank always filled with oil; at the same time, due to the presence of the oil sump, the contact area between the oil and air is reduced, which can slow down the oxidation of the oil.
7. Gas Relay
The gas relay, also known as the gas protection relay, is the main protection device for internal faults of the transformer. It is installed in the middle of the connecting pipe between the oil tank and the oil sump. When a serious fault occurs inside the transformer, the gas relay connects the circuit breaker trip path; when a less serious fault occurs inside the transformer, the gas relay connects the fault signal circuit.
8. Insulation Bushing
The high and low insulation bushings are located on the top cover of the transformer oil tank. For oil-immersed transformers, porcelain insulation bushings are generally used. The insulation bushing's function is to maintain good insulation between the high and low voltage windings leads and the oil tank, and to fix the leads.
9. Explosion-proof Tube
The explosion-proof tube, also known as the safety air passage, is installed on the transformer's oil tank. Its outlet is sealed with a glass explosion-proof membrane. When a serious fault occurs inside the transformer and the gas relay fails, the gas inside the oil tank will break through the glass explosion-proof membrane from the safety air passage and prevent the transformer from exploding.
Our Advantages
1.The insulation performance is excellent, which can reduce the insulation distance and lower the cost.
2.The transformer oil has a low viscosity and good heat transfer performance.
3.It can effectively protect the core and windings from the influence of moisture in the air.
4.It protects the insulating paper and insulating paperboard from the action of oxygen, reduces the aging of insulating materials, and extends the lifespan of the transformer.
5.Low maintenance cost and low noise level
Product Parameters
S9-M(30-2500)/10 3 Phase Oil-Immersed Distribution Transformer
Rated
capacity(kVA) |
High voltage(kV) |
Tap range |
Low voltage(kV) |
connected group label |
No-load
loss(w) |
Load loss
(75ºC)(W) |
No-load current(%) |
30 |
6
6.3
6.6
10
10.5
11 |
±2*2.5
±5 |
0.4 |
Dyn11
Yyn0
Yzn11 |
80 |
630/600 |
1.5 |
50 |
100 |
910/870 |
1.3 |
63 |
110 |
1090/1040 |
1.2 |
80 |
130 |
1310/1250 |
1.2 |
100 |
150 |
1580/1500 |
1.1 |
125 |
170 |
1890/1800 |
1.1 |
160 |
200 |
2310/2200 |
1.0 |
200 |
240 |
2730/2600 |
1.0 |
250 |
290 |
3200/3050 |
0.9 |
315 |
340 |
3830/3650 |
0.9 |
400 |
410 |
4520/4300 |
0.8 |
500 |
480 |
5410/5150 |
0.8 |
630 |
Dyn11
Yyn0 |
570 |
6200 |
0.6 |
800 |
700 |
7500 |
0.6 |
1000 |
830 |
10300 |
0.6 |
1250 |
970 |
12000 |
0.5 |
1600 |
1170 |
14500 |
0.5 |
2000 |
1550 |
18300 |
0.4 |
2500 |
1830 |
21200 |
0.4 |
NOTICE!
Important: Please provide the following information before placing your order:
1. Type of prefabricated substation;
2. Transformer model and capacity requirements;
3. Main wiring scheme for high and low voltage circuits;
4. Specifications and parameters for any special electrical components needed;
5. Desired shell color;
6. Names, quantities, and any other requirements for spare parts and accessories;
ABOUT OUR COMPANY
Golden Triangle Power Technology Co., Ltd. (stock name: Golden Triangle, stock code: 837424) has been a beacon of innovation and excellence since its inception in November 2009. Renowned for its specialization in research, development, production, sales, and technical services of high-quality power products, our diverse catalog includes three-dimensional coil core transformers, amorphous alloy core transformers, amorphous three-dimensional coil core transformers, photovoltaic substations, energy storage equipment, high and low voltage switchgear, and outdoor box substations in European, American, and Chinese designs, as well as intelligent substations. As a production-service-oriented enterprise, we excel in construction EPC projects, and our cutting-edge products are deployed across a myriad of industries such as State Grid, Southern Power Grid, railways, mines, infrastructure, metallurgy, roads and bridges, and property management.
Golden Triangle proudly holds ISO9001:2015 quality management system certification, ISO14001:2015 environmental management system certification, ISO45001:2008 occupational health and safety management system certification, PCCC energy-saving product certification, national mandatory product 'CCC' certification, CQC China quality certification, and an AAA credit rating certification. Our esteemed accolades include recognition as a national high-tech enterprise, a provincial 'specialized, special and new' small and medium-sized enterprise, and one of the top 100 most promising scientific and technological enterprises in the province. We are also a municipal green factory. Our facilities boast a provincial high-tech enterprise research and development center, an academician workstation, a doctor innovation workstation, three invention patents, and 51 utility model patents.
Our products are proudly listed in the 'Energy Saving and People Benefiting Project' and the 'Recommended Catalog of Energy Saving Electromechanical Equipment' by the Ministry of Industry and Information Technology, the Ministry of Finance, and the National Development and Reform Commission. As the first enterprise in Wenzhou's power industry to receive direct subsidies from the Ministry of Finance for product sales, Golden Triangle has earned numerous accolades and honorary titles for national industrial energy-saving technical equipment products and the first set of products in key fields of provincial equipment manufacturing. Our flagship products, 'SCB13-RL solid triangle iron core dry-type transformer' and 'SBH16-RL solid triangle rolled iron core amorphous transformer,' adhere to 'Zhejiang manufacturing quality standards.' We have pioneered the drafting of 10 standards, making substantial contributions to energy conservation, emission reduction in China's power industry, and the advancement of green energy technology.
THE HONOR OF COMPANY
In an era of intense market competition and rapid technological progress, Golden Triangle steadfastly upholds the belief that 'quality is the enterprise's life.' By rigorously implementing the ISO9001:2000 international quality management system, we are committed to delivering 'quality excellence, impeccable service, superior product quality, and continuous quality improvement.' This enduring dedication ensures our customers' utmost satisfaction. Golden Triangle was among the pioneers included in the 'Energy Saving and Huimin Engineering Energy-Efficient Distribution Transformer' initiative by the National Development and Reform Commission, Ministry of Finance, and Ministry of Industry and Information.
Two-year warranty
More than three certifications
15 years of accumulated experience
Packaging & Shipping
product recommendation
The exhibition we attended
Display area
SEVERAL PICTURES ABOUT COMPANY AND PRODUCTION
- Q: Are you manufacturer?
A: Yes, we are manufacturer. Our factory is in Wenzhou China
- Q: Can I get guarantee of products?
A: Yes, every product is 1 year quality warrantee under customer correct using the products.
- Q: Do you have any Certificate?
A: Yes. Each of our unit has CCC, ISO9001 certificate. All the electric parts with CE certificate, If you need any other Certificate, we can help you to get it.
- Q: How to buy it? What about the delivery?
A: Please contact me by email or online, let me know your situation, I will give you professional solution. We have shipping agent can choosing the cheapest and fastest delivery. FOB, CIF, C&F or EXW are no problem for us.
- Q: What's the payment terms?
A: For small testing orders, we can accept Waster union, T/T and Credit card.
For mass orders, we accept t/t and L/C.
- Q: What about the production?
A: Produce time is 4~6weeks.
- Q: Could you offer some spare parts?
A: Yes, no problem.
- Q: What about the maintenance?
A: All the goods past the test, maintenance is very easy.
The company adheres to the quality policy of "quality first, honestservice, strict management, and striving for perfection", and gives back tothe majority of users with first-class technology, first-class quality, and first-class service. We warmly welcome people from all walks of life to visit us forguidance and negotiation, to seek common development, to jointly build a'win-win" and to create a better future with you !